Construction Standard of “Koralowa Park”
BUILDING
Height: three above-ground floors and one garage floor
Structure: reinforced concrete
Walls: made from ceramic hollow blocks, walls between apartments and floor slabs are made from reinforced concrete
Roof: steel, made from zinc-plated sheet
Facade: in the light system, with wet flashings made from zinc-plated sheet
Railings and barriers: steel
Window carpentry: PCV windows K=1.1, roof windows
Entrance doors to the building: aluminium, lighting plafonds
Staircase: reinforced concrete, Calabria gres tiles on floors and stairs, handrails with wooden top, staircase banisters, system doormats, encased counter cabinets
Surroundings: greenery, small architecture, area lighting, porter’s lodge, automated entry gate to the estate, car parks from Koralowa and a hardened lot.
GARAGE AND FLOORS -1 AND +1
Garages: remote-operated sectional entry gates
Floors, walls, ceiling: concrete
APARTMENTS
Internal walls: gypsum plaster cat. III, roofing G-K slab on steel grate, luted joints
Floors in rooms, hall, kitchen, bathroom and WC: concrete floorInternal
sills: postforming board, white
External doors: anti-burglar, veneeredInternal
doors: without internal carpentry
Fittings in bathroom and WC: fittings for the installation of a basin, a WC and an automatic washing machine
Kitchen furnishings: water fitting for a sink, a 380V outlet for a cooker with ceramic slab
Water system: from the municipal network – PE pipes, individual dimensions
Sewage system: to the municipal network – PCV pipes
Electric installation: (lighting) – 1 lighting point per a room below 16 m2, 2 lighting points per a room with an area over 16 m2. (220V sockets) – 2 sockets in rooms below 16 m2 (except WC), 3 sockets in rooms over16 m2, 1 380V socket in the kitchen.
Heating system: central heating – heaters with thermoregulator
Phone installation: 1 socket
TV installation: 1 socket
Intercom installation: intercom
The apartment sketch is the designers' demonstration version.
Interior arrangement may be changed in the range to be agreed with the Investor. The resignation statement will be covered in a separate annex to the Final Sale Contract.
Additional work will be covered by a separate agreement.
